
Key Points
- The FBM KLCI is down -3.8% YTD, as a bond-driven selloff in banks and persistent foreign selling weighed on the heavyweights. Beneath the index, small caps and data centre investment theme sectors have led since mid-year.
- 2Q26 earnings beat expectations, but the gains came from a narrow set of sectors. We expect 3Q26 to widen the gap between the data centre investment cycle on one side and banks and consumer on the other.
- Macro remains strong, with 3Q26 GDP growth of 5.3% y/y and exports up +54.5% y/y in September. We expect the OPR to stay at 2.75% through 1H27, with a hike possible in 2H27 as the higher minimum wage lifts inflation risk.
- Foreign shareholding is at a record low, limiting further downside, while the KLCI-50 expansion will bring technology and the investment cycle into the benchmark.
- We maintain our 3.0 Stars "Attractive" rating with a target of 1,900 (15x FY28F P/E), implying 14.3% upside, and favour positioning across both large caps, where the selloff offers upside, and small-mid caps, where earnings growth is strongest.
Banks dragged the index, while the investment cycle carried the broader market
As at 30 October 2026, the FBM KLCI closed at 1,615.60, down -3.8% YTD, with banks the key drag as the Bursa Malaysia Financial Services Index fell -15% from its February peak on concerns over bond losses as MGS yields rose.
Beneath the index, however, leadership moved to the small caps and to the data centre and infrastructure build-out. The FBM Small Cap Index gained 3.6% in 3Q26, while the FBM KLCI declined -0.8%. At the sector level, leadership passed from technology, which surged close to +50% in 2Q26 before easing -1.3% in 3Q26, to construction, energy and utilities. The laggards were the sectors most exposed to costs and interest rates, including financials, consumer and property.
In our 2H26 outlook, we had expected the energy shock to spill over into the domestic economy and positioned defensively in large caps. However, the BUDI95 subsidy has kept higher fuel prices from passing through to the broader economy, while data centre, grid and renewable energy projects run on multi-year contracts that the war has not disrupted. As such, the market rewarded sectors where contracts are converting into earnings and sold those exposed to higher costs and yields. To break it down further, the 3Q mid to small-cap rally was mainly driven by local institutions, whose fund managers were generating alpha on the stellar earnings, while foreign selling stayed concentrated in the liquid large caps, such as banks and utilities.
Figure 1: Leadership passed from technology in
2Q26 to construction, energy and utilities in 3Q26.
Figure 2: Foreign fund flow in
September.
2Q26 Earnings growth is intact, but increasingly narrow
The 2Q26 results season was stronger than expected, with 31% of companies beating consensus and 44% in line, leaving only 25% below expectations. That said, the beats came from two groups. The first was capex-driven sectors. ViTrox’s net profit more than tripled y/y on demand for AI-related inspection equipment, and YTL Power beat on its data centre and power businesses. Meanwhile, data centre contractors such as Sunway Construction and IJM delivered in line as record order books moved into execution. The second group benefited from the energy shock. Dialog gained from demand for independent storage capacity outside the conflict zone, MISC from higher tanker rates as vessels were rerouted, and the planters from firmer CPO prices. In contrast, misses were concentrated in consumer and materials, where costs rose faster than prices. Retailers such as MR DIY could not fully pass on higher operating costs amid softer store productivity, while Petronas Chemicals was weighed down by higher feedstock costs and plant turnarounds that lowered utilisation. Banks were mixed, as NIMs declined on higher funding costs.
That said, moving forward, we expect 3Q26 to widen this divergence. Among leading indicators, construction output grew 6.0% y/y, while E&E-led manufacturing rose 7.5% y/y in 3Q26, pointing to stronger billings for MEP contractors, renewable energy EPCC players and semiconductor equipment makers. On the other hand, banks are likely to report a soft quarter on weaker treasury income after the spike in bond yields, while consumer companies are likely to be impacted by higher operating costs amid more cautious discretionary spending. That said, we see the softness in banks as temporary, as most bonds are held at FVOCI or to maturity, where losses are taken against book value and reverse as the bonds approach maturity, while banks’ strong capital positions can comfortably absorb them.Hence, we believe the softness is largely reflected in valuations after the recent selloff. As such, while a soft 3Q26 could potentially weigh on near-term KLCI earnings, we believe much of it has already been priced in the recent large-cap selloff. On top of that, we do not see it changing the earnings path into FY27, which continues to be driven by the data centre and infrastructure buildout.
Figure 3: 75% of companies beat or met
expectations in 2Q26.
Source: J.P. Morgan, Bloomberg Finance L.P., iFAST compilations. Data as of September 2026.
Table 1: Potential data centre jobs in the pipeline.
|
Company |
Data centre details |
Land |
Estimated total capacity |
Capacity under construction / already awarded |
Capacity yet to be built and awarded |
Potential job value for DCs yet to be built and awarded |
|
Pearl Computing Malaysia |
DC in Elmina Business Park Phase 2 |
77 acres |
c.125MW across two DCs* |
Core and shell works for the latest DC (MYR658m) awarded to IJM in Apr 2026 under Package 2; Package 1 core and shell plus MEP awarded in Oct 2025 |
All core and shell works awarded; only MEP works for Package 2 not awarded |
c.MYR500-700m for the MEP portion of Package 2 |
|
Pearl Computing Malaysia |
DC in Eco Business Park V |
92 acres |
140MW to 175MW* across two DCs |
Core and shell works worth MYR2.1bn awarded to Gamuda |
All core and shell works awarded; only MEP works not awarded |
MYR1.5-2.0bn for the MEP portion of Package 2 |
|
Microsoft |
Various plots in Johor that could be developed into DCs under Microsoft's South-East Asia 3 region |
370 acres (across five plots) |
c.590MW* |
0MW as far as listed contractors are concerned |
c.590MW as far as listed contractors are concerned |
c.MYR11.8bn** |
|
Yondr |
DC in Sedenak Tech Park, Johor |
72.8 acres (incl. capacity being built) |
300MW |
c.100MW |
c.200MW |
c.MYR6bn*** |
|
EdgeConneX |
Planned DC in Johor |
n.a. |
Initial 36MW, scalable to 160MW |
Likely no award yet to listed contractors (0MW) |
160MW |
c.MYR3.2bn** |
|
Digital Edge DC |
DC in Klang Valley |
49.7 acres acquired in Kota Tinggi |
c.80MW (estimated) |
0MW |
c.80MW |
c.MYR1.6bn** |
|
TM Nxera JV |
DC in Johor |
n.a. |
Initial 64MW, scalable to more than 200MW |
c.64MW awarded |
>100MW |
At least MYR2bn** |
|
Source: RHB Research, iFAST compilations. Data as of September 2026. *Based on an assumption of 1.6MW per acre for DCs in the Klang Valley. **Based on a conservative construction cost of MYR20m per MW. ***Based on a cost assumption of MYR30m per MW for Yondr in Sedenak. Source: Various, RHB Research. |
||||||
Table 2: Infrastructure projects in the pipeline (not exhaustive)
|
Project |
Estimated job value (MYRbn) |
Latest updates |
Potential winners |
|
Kita Selangor Rail Line |
n.a. |
Connects KLIA to Sungai Pelek (Sepang) and Tanjung Sepat (Kuala Langat); expected to take 10 years to complete once approved by the Government |
IJM, MRCB |
|
Sungai Rasau Water Supply Scheme Stage 2 |
2.0 |
Expected to be awarded in CY27 after Stage 1 is completed |
Gamuda, Taliworks |
|
Petaling Jaya hospital |
n.a. |
Health ministry has agreed on a site for a 500-bed public hospital in Petaling Jaya |
IJM, Gadang, Kimlun |
|
230km stretch of WCE from Banting to Gelang Patah |
n.a. |
Awaiting complete information from the Government on the proposed southern extension under a privatisation model before determining viability |
Gadang, Kimlun, WCT |
|
Northern Coastal Highway Sarawak |
6.1 |
Four-lane highway connecting Limbang, Brunei and Miri with Lawas; expected to take five years to complete |
Kimlun, Gamuda, Naim Holdings, WCT |
|
East Coast Rail Link Port Klang Link Section D |
0.6-0.9 |
Rail lines connecting ECRL's Jalan Kastam station to Westports and Northport; expected to be awarded by 1HCY26 |
WCT-MMC JV, Dhaya Maju Infrastructure (Asia), DOM Industries (M) |
|
Penang LRT Mutiara Line Segment 2 |
5-6 |
Macallum to Penang Sentral via a 5km bridge; tenders out in Oct 2025, outcomes likely known in November |
IJM, MRCB, Kerjaya Prospek |
|
Penang LRT Mutiara Line System Works |
3-4 |
Systems package awarded to a JV between MRCB and Theta Edge |
MRCB and Theta Edge JV |
|
Johor Bahru Autonomous Rapid Transit |
7-10 |
Public-private partnership with costs shared between the Government and the concessionaire |
Consortium led by MMC-DOM Industries JV |
|
Sungai Klang Link elevated highway |
8-10 |
Outcome should be known by end-CY26 |
Econpile, MTD Construction (MoUs signed) |
|
Juru-Sungai Dua elevated highway |
3.0 |
Construction commenced in 4QCY25 |
Pintaras Jaya |
|
West Ipoh Span Expressway |
5-6 |
Construction expected to begin after 2026 once the concessionaire fulfils conditions in the agreement |
IJM, Gadang |
|
Trans-Borneo Railway |
63 |
MYR7m allocated for feasibility studies, expected to conclude in 3Q26 |
IJM, Kimlun, Naim Holdings |
|
Langat 2 and Kedah water treatment plants |
13 |
Langat 2 to supply 730 MLD of treated water to Selangor, Kuala Lumpur and Putrajaya |
Taliworks, IJM |
|
Mass Rapid Transit 3 |
34.3 (civil works) |
Public inspection ended Dec 2024; MRT Corp cited that construction could begin in CY27 |
Sunway Construction, IJM, Gamuda, TRC Synergy |
|
Source: RHB Research, iFAST compilations. Data as of September 2026. |
|||
Robust domestic economy, with no urgency for BNM to move for the rest of 2026
Malaysia’s economy grew 5.3% y/y in 3Q26, bringing 9M26 growth to 5.5% y/y, on the back of exceptional export strength, with exports growing 54.5% y/y in September, the fastest pace since April 2021. While part of the surge reflects higher oil and LNG prices, with mining exports up +56.3% y/y, the bulk of the growth came from E&E, where shipments to the US rose 89.9% y/y to a record, indicating that Malaysia is capturing a meaningful share of global AI hardware demand. With approved investments of RM218.5bn in 1H26, of which RM95.8bn came from data centres, and SoftBank reportedly planning a further USD50bn of AI and data centre investment, we see the data centre and infrastructure buildout extending well into 2027.
Meanwhile, inflation remains manageable at 1.8% y/y in September, as the BUDI95 subsidy absorbed much of the energy shock, although producer prices rose +10.7% y/y in August. With growth topping estimates without stoking inflation, we see no solid case for BNM to raise rates in the near term and expect the OPR to stay at 2.75% through 1H27. That said, we do not rule out a hike in 2H27, as the minimum wage increase to RM2,000 from RM1,700 in June 2027 points to higher inflation risk.
Figure 4: Malaysia's 3Q26 GDP again exceeded
market expectations.
Foreign investors remain absent despite Malaysia's economic resilience.
YTD, foreign investors have sold about -RM6.7bn of Malaysian equities, on top of -RM22.3bn in 2025, taking foreign shareholding to a record low of 17.8%. This came despite Malaysia being one of the more resilient economies in ASEAN through the war, as a net exporter of crude oil and LNG with a current account surplus and a stable currency. We see three reasons why this resilience has not translated into foreign interest in the equity market.
Firstly, the gains from higher oil prices accrue largely outside the listed market. The windfall flows mainly to Petronas and the government, which recycles much of it into the BUDI95 subsidy, while listed energy companies make up less than 10% of the FBM KLCI. On top of that, domestic oil and gas activity hasn’t been lifted meaningfully, as Petronas' 2026-2028 Activity Outlook deferred or cut capex, leaving services players without a clear order catalyst.
Secondly, the Fed's renewed tightening has pushed global funds to cut emerging market exposure, with larger cap counters such as liquid banks getting sold off. Rising MGS yields then added a second leg, as JPMorgan's downgrade of CIMB and AMMB on concerns over bond losses sent the Financial Services Index down -2.7% on 7 October. We believe the selloff reflects higher yields and funding costs delaying the margin recovery rather than any deterioration in asset quality, as the six largest banks hold CET1 ratios of 12.9%-14.9%, and it has left the sector trading below its 10-year average P/B with a dividend yield above 6%.
Lastly, consensus earnings growth of around 7% for the FBM KLCI offers little to global investors chasing the AI theme, who have gone to Taiwan and Korea for exposure, while Malaysia's own AI and data centre beneficiaries sit largely in the small and mid caps, which, in our view, are less likely to attract foreign inflows, partly due to the liquidity thresholds of most foreign funds.
Moving forward, we expect higher US rates and oil prices to keep foreign flows volatile. Nevertheless, we see limited room for further selling from current levels, as domestic fundamentals remain intact, with the economic growth and the data centre buildout remaining on track, along with the expansion of KLCI should invite more interest from global investors. On top of that, we believe large-cap counters such as banks and utilities, as the most heavily sold and most liquid part of the market, stand to benefit most should flows return, particularly those with lower exposure to bond losses such as Hong Leong Bank and RHB, as well as the national grid monopoly TNB.
Figure 5: Foreign shareholding of Malaysian
equities has fallen to a record low.
Source: Bursa Malaysia, JPMorgan, iFAST compilations. Data as of September 2026.
Ringgit to hold within 4.05-4.15
The Ringgit closed at 4.0554 against the US dollar on 30 October, broadly unchanged YTD and within the 4.05-4.15 range it has held since June, as Malaysia's trade surplus kept it stable even as the rupiah and peso weakened. As highlighted in our recent write-up, we hold a neutral view and expect USD/MYR to trade within 4.05-4.15 by end-2026, as a further Fed hike limits room for appreciation, while the repatriation of export earnings cushions the downside.
Figure
6: Malaysia's Ringgit projection.
KLCI-50 and Indonesia's review could make Malaysia more investable
The expansion of the FBM KLCI to 50 constituents, with new names entering at half weight on 21 December 2026 and full weight on 21 June 2027, will change what the index represents. Based on our simulation, banks, utilities and plantations would fall to around 57% of the index from 66%, while technology would rise from 0 to 3.8%, with energy, REITs and ports entering for the first time. As such, the FBM KLCI will no longer belong only to the traditional sectors, and will better reflect the growth drivers of the economy, from the data centre buildout to the semiconductor supply chain. Moreover, inclusion in the benchmark should raise the visibility of these companies among index-tracking and benchmark-aware investors, which we see as supportive of liquidity and investor interest over time.
That said, while we acknowledge the lower weight of banks and utilities in the expanded index poses a risk of rebalancing-driven selling in the sector, the impact is likely to be minimal as foreign passive funds largely track MSCI Malaysia rather than the FBM KLCI, while domestic ETFs tracking the FBM KLCI have relatively small AUM.
Table 3: Estimated FBM KLCI sector weights before and after the expansion
|
Sector |
Additions |
Weight now (%) |
Weight after Jun-27 (%) |
|
Financial Services |
Alliance Bank |
42.0 |
35.7 |
|
Utilities |
- |
16.9 |
14.0 |
|
Telecommunications & Media |
TIME dotCom |
8.6 |
8.1 |
|
Industrial Products & Services |
LMC, UWC, Kelington |
8.0 |
8.2 |
|
Plantation |
United Plantations |
7.4 |
7.2 |
|
Consumer Products & Services |
Sime Darby, QL Resources |
4.4 |
5.8 |
|
Healthcare |
KPJ, Top Glove |
4.9 |
5.4 |
|
Construction |
IJM, Sunway Construction |
4.1 |
5.2 |
|
Technology |
ViTrox, Inari, Frontken, MPI |
- |
3.8 |
|
Transportation & Logistics |
Westports |
2.8 |
3.4 |
|
Property |
Sime Darby Property |
0.8 |
1.2 |
|
Energy |
Dialog |
- |
1.2 |
|
REITs |
IGB REIT |
- |
0.7 |
|
Source: Bloomberg, iFAST compilations. Prices as at 28 October 2026. Weights are iFAST estimates and may differ from FTSE's investability-weighted figures. |
|||
Meanwhile, MSCI's proposal to reclassify Indonesia to Standalone status, with a decision due by June 2027, could put Malaysia back on the radar of regional investors, given its existing MSCI representation and comparable bank-heavy exposure. That said, direct passive inflows are likely to be modest given Indonesia's small benchmark weight, and global EM funds may redistribute capital towards North Asia instead.
Read more: Indonesia: Cheap, but MSCI keeps the exit open; Maintain 2.0 Stars on ASEAN, favour SG and MY
Position across both large caps and small-mid caps
At 1,615.60 (as of writing), the FBM KLCI trades at 13.5x FY27F P/E, below our fair P/E of 15x. With consensus FY28F EPS revised downward to 123.0 from 126.7, we derive our end-2028 target of 1,900, implying 14.3% upside, alongside an average dividend yield of 4.81% over the next three years. We therefore maintain our 3.0 Stars "Attractive" rating on Malaysian equities.
We believe positioning across both ends of the market is prudent, as each offers a different source of return. For large caps, the case rests on valuation rather than near-term earnings. After the selloff, financials trade at 1.07x P/B against a historical mean of 1.11x, which we believe already prices in softer 3Q26 bank earnings.
For small-mid caps, the case rests on earnings. The data centre cycle is spilling over from the main contractors to MEP, cooling and electrical specialists, while CRESS and LSS6 are set to create solar EPCC opportunities, with grid interconnection works flowing to power infrastructure contractors. That said, construction, industrials and technology now trade above their historical mean P/E. As such, we continue to favour the construction pipeline, grid capex, renewable energy and technology themes, but prefer companies whose order books are already converting into earnings over those still priced on the narrative.
Accordingly, we recommend the iShares MSCI Malaysia ETF (NYSE: EWM) for broad exposure to Malaysian equities.
Table 4: FBM KLCI valuation.
|
FBM KLCI Index |
FY25 |
FY26 |
FY27 |
FY28 |
|
PE Ratio (x) |
|
14.6 |
13.8 |
13.1 |
|
Expected Earnings Growth |
-6.01% |
6.4% |
5.5% |
5.4% |
|
Earnings Per Share (EPS) |
104.0 |
110.6 |
116.6 |
123.0 |
|
Dividend Yield |
4.04% |
4.51% |
4.80% |
5.12% |
|
Fair PE (x) |
|
15 |
||
|
Target Price (MYR) |
1900 |
|||
|
Potential Upside (%) (Based on fair PE ratio of 15x) |
14.3% |
|||
|
Source: Bloomberg Finance L.P., iFAST compilations. Data as of 30 October 2026. |
||||
Figure 7: Construction, utilities and industrials trade above their historical mean P/E, while financials, consumer and telco trade at discounts.

Downside risks
1. Weaker-than-expected 3Q26 earnings
A broader pass-through of higher energy, freight and raw material costs could compress margins, particularly for consumer and manufacturing companies.
2. Further Fed hikes and higher bond yields
A longer Fed tightening cycle would keep foreign investors away from emerging markets and weigh on the valuations of growth stocks, including the technology names that have led this year.
3. Prolonged US-Iran tensions and disruption in the Strait of Hormuz
A prolonged conflict would raise the fiscal cost of the BUDI95 subsidy, increasing the risk of subsidy rationalisation that would pass higher fuel costs on to households and businesses.
4. Domestic political developments
The Melaka state election and the run-up to GE16, which must be held by February 2028, may raise the market's risk premium and weigh on sentiment. Nevertheless, we do not expect politics to change the fundamentals of the themes we favour, which rest on multi-year investment commitments.

